WELL TO PUMP CONNECTION (SUCTION PIPE)
4b. For driven wells, a check valve is required at the top of
the well to maintain prime. Flow arrow must point toward
pump. (Fig. 4b)
IL1475
Pump
Flow Arrow
4b
IL1396
2
IL1395
Tape
1
2. Finish the connection to your well with additional pipe and
ttings as needed. (Fig. 2)
1. Make the connection to your well. Wrap all threaded
ttings with pipe tape 5 times or apply a pipe paste
(pipe dope) to ensure an air tight connection. (Fig. 1)
Deep Well Application Only:
IL1397
5
5. Finish the connection to your well with additional pipe and
ttings as needed. (Fig. 5)